SAN DIEGO COUNTY · HOMES & BUSINESSES(858) 750-6017
SAN DIEGO · POST-CONSTRUCTION CLEANING

Final cleaning.Ready for
handover.

The build is nearly done.
Let’s make the finish show.

Final cleaning for commercial build-outs, new construction, and remodels across San Diego County. Finished surfaces, glass, and floors—planned around your walkthrough.

Start with your name and number. Project details are optional.

PCS crew in hard hats and safety vests detailing large glass panels
OSHA 10 & OSHA 30Trained personnel on our team
A defined cleaning scopeSurfaces, access, and inclusions agreed up front
Built around your projectCoordinate around trades and walkthroughs
BEYOND A QUICK WIPE-DOWN

Post-construction cleaning.
The last pass matters.

Post-construction cleaning brings the finished work into focus. We agree on the areas and surfaces that need attention, then build the cleaning scope around your project.

PCS technician cleaning glass beside a door frame with a protective drop cloth below

Finished surfaces

Construction dust on accessible ledges, doors, trim, cabinetry exteriors, and fixtures. Attention to the edges and touchpoints that shape a first impression.

Windows, glass & frames

Agreed interior and exterior glass, frames, sills, and tracks. Paint, adhesive, protective films, and other construction residue are assessed before cleaning.

Floors & shared spaces

Cleaning suited to the installed flooring and its care requirements. Include the rooms, corridors, entrances, and shared areas that need to be ready.

Your written quote confirms the inclusions. Specialty residue removal, debris hauling, and return visits are not assumed.

BEFORE MOBILIZATION

Jobsite requirements.
Part of the plan.

Coordinate the cleaning scope with your superintendent’s look-ahead schedule, site safety requirements, and turnover milestones.

  • 01 / SITE COORDINATION

    JHAs & pre-task planning.

    Review job hazard analysis (JHA) requirements for the cleaning scope, changing site conditions, and work alongside other trades.

  • 02 / SITE COORDINATION

    Orientation & safety meetings.

    Coordinate site onboarding, required PPE, toolbox talks, and jobsite safety meetings with your superintendent or GC’s safety team.

  • 03 / SITE COORDINATION

    Equipment-specific training.

    Identify operator training, authorization, and documentation requirements for specialized equipment—including aerial lifts when they are part of the scope.

  • 04 / SITE COORDINATION

    Pre-use equipment checks.

    Review pre-task equipment checks, inspection records, and reporting procedures before mobilization. Confirm the requirements for the equipment assigned to the work.

Still in the construction phase? We also provide janitorial support for job trailers and designated shared spaces.

Explore jobsite janitorial
BEFORE THE FINAL CLEAN

The details
worth settling.

Clear expectations protect the schedule—and the finished work.

Talk to PCS: (858) 750-6017
When should we schedule a final clean?

Plan the final clean after major dust-producing work is complete and the agreed areas are ready to clean. Share the trade schedule, access restrictions, and walkthrough date with us. If work is continuing in other areas, we can discuss a phased scope and separately quoted touch-up visits.

Do you clean new homes and residential remodels?

Yes. Final cleaning is available for residential construction and remodels as well as commercial projects. Tell us whether the property is vacant or occupied, which rooms are included, and what work is still underway so we can plan around the space.

What determines the price of post-construction cleaning?

The size of the project is a starting point. The amount of dust and residue, glass area, surface materials, access, timing, and number of visits also affect the scope and price. Send the location, approximate square footage, a brief description, and any useful photos. We’ll follow up to confirm details and whether a walkthrough is needed.

Can you remove paint, adhesive, or other construction residue?

Flag these materials before the quote is finalized. Removal depends on the deposit, the underlying surface, and any coating or manufacturer restrictions. Specialty residue removal is assessed separately; it is not an automatic inclusion or a promise that every mark can be removed.

Does a final clean include hauling away construction debris?

Do not assume demolition debris, leftover building materials, or bulk packaging removal is included. Let us know what remains on site so removal responsibilities can be agreed before the cleaning visit.

What should we flag about newly installed finishes?

Share the installed materials, coatings and manufacturer care instructions, plus any paint, adhesive or protective film that remains. We review residue removal separately from routine dust cleaning. Before work begins, agree which areas are released for cleaning, who removes protective coverings and whether a test area is needed.

What should our superintendent send before mobilization?

Share site orientation and JHA requirements, the look-ahead schedule, area-release dates, equipment restrictions, and required training documentation. We’ll review the requirements for the proposed crew and cleaning scope before confirming the work.

LET’S PLAN YOUR FINAL CLEAN

What needs to be ready,
and by when?

Tell us about the project. We’ll follow up to discuss the scope, pricing, and schedule.

Submitting a request does not book a visit.

A useful starting point

  • Project address and approximate size
  • Rooms, surfaces, and glass to be cleaned
  • Look-ahead schedule, area releases, and site requirements
  • Target cleaning date and walkthrough date

Photos are welcome in the quote form.

Final cleaning across San Diego County. Serving projects in San Diego, La Jolla, Del Mar, North County, and surrounding communities. Tell us the address so we can confirm availability.

Find your service areaCommercial property careWindow cleaning
Call PCSGet a quote